Two jobs, one morning – and zero delays

By Michael Walther

Some mornings get off to a fast start – today was one of them. At 07:00, we met up at headquarters to load the gear for a scheduled fiber installation. Just as we were about to head out, the phone rang – an urgent job had just come up on the other side of the municipality. Two installations before office hours? No problem. We made a quick plan and got moving

Jetting. Installation at manhole and the endpoint cabinet
Installation at manhole and the endpoint cabinet

On Site and Ready to Roll

The first installation remained the top priority. By 07:30, we were on site and setting up. We assembled the Jetting Working Table and positioned the cable drum. The equipment – Jetting V2 and Jetluber – was ready to go within five minutes.

We began, as always, by blowing lubricant and cleaning plugs through the ducts to clear out any dirt or moisture. A clean path makes a big difference when it comes to installation quality and speed.

The Jetting setup used for the morning job
The Jetting setup used for the morning job

Smooth progress

The first cable was 1100 meters and started off at around 150 m/min. After 450 meters, the speed had dropped to 65 m/min, so we switched on the air. With 6.5 bar pressure, the cable picked up speed again, finishing at around 85 m/min.

The second cable – 510 meters – was installed without air. Once both cables were marked and secured, we packed up and hurried back to HQ to return the cable drum.

Next stop

At 08:30 sharp, we rolled into the second site – straight to work, no delays, no downtime. Everything clicked. It’s moments like these that show the power of solid planning, hands-on experience, and having the right machine by your side.

This morning, we used the Jetting V2 – our go-to for reliable, right-on-time performance. No fuss, just results.

/Michael “Micke” Walther